2316 Chapparal Place 2006

This Gallery contains shots of the second year in our new home.
 

Much of the interior is still under construction, as we had to wait until our old house sold to have the capitol to finish the new one.  we will update you with all the before and after shots throughout the year as each section gets finished.

    
The Office Before.           After


Well we finally finished our first project.  The office.  While we were down Ashley & Storge had to use a makeshift computer setup in the living room.


L-R.  The room is gutted. Designed via CAD. The basic structure goes in.


The finishing goes in.  The 12' desktop is brought in as one solid piece.


L-R. At both office ends we have two drawers, a trash can, & a shredder.  The center return is removable
and converts the office into a guest room.  Printers are now off the desk onto shelves. The 3 printers
consist of an everyday printer, a CD printer, and a poster printer.  All the wires are now neatly routed
in cable conduit.  We've learned something while doing big installations over the years!


L-R. Home computer. Stocked shelves. The under cupboard light rail. Small cupboards. The hanging
home computer.  The built in Media server.


L-R. The media server side. The return with cable runners. The paper stock. New
florescent lighting with matching cherry finish end caps light up the room.


This is our outdoor cat "True".  True belongs to the girls next door, but has adopted us.  True lives on the hot tub all day.  Goes ?? at night.

 

      
The Library Before.         After

 

                  
The Media Room Before.              After

      
Master bed Before.         After

 

Home | News | Paul's World | Leslie's World | Ashley's World | Photo Galleries | Photography | Paul's 350Z Site | WCSL | Links

(c) 2005 dotyonline.com All rights reserved. Last updated on 12/04/06 07:50 PM